US 31 + Thompson Rd

US 31 + Thompson Rd

Sep

13

Author Icon

Ashlyn Halstead

Boost This Post

Boost Icon

Project by the Numbers:

  • 12,100 tons of Hot Mix Asphalt
  • 2,750 SYS of Bridge Deck Overlay
  • 3,800 LFT of Storm Pipe

Two years ago, we started our work on the US 31 & SR 135/Thompson Rd Intersection Improvement and Bridge overlay in the Indianapolis area. This project intent was to increase efficiency and flow of traffic through US 31. The eastbound I-465 exit ramp to southbound US 31 was reconfigured from a free-flow ramp to a signalized intersection. Bridge deck overlays were completed on two I-465 entrance ramps. The intersection of US 31 and SR 135/Thompson RD was reconfigured from the existing signalized intersection into a displaced left turn intersection. The intersection also received an upgrade to pedestrian facilities such as added sidewalk and signaling. The curb was replaced throughout the project. The drainage was completely replaced with new storm structures, pipe, and detention basins. The project was completed with resurfacing of the entire contract.

A fun fact about this project: This project is that the left turn intersection is the first of its kind in Indiana! The displaced left turn configuration moves the left turns on US 31 that are in conflict, out of the intersection and synchronizes it with the signal cycle of the intersecting road. The turn lanes are synchronized with the main intersection, creating a continuous flow of traffic.

Check out the video below for a complete overview of the completed project!

Boost This Post

Boost Icon

Related Posts

Milestone Paving Crews Using Innovative Solutions for Longer-Lasting Roads on U.S. 30

Jul

16

Milestone Partners Across its HC+M Network to Deploy Innovative Solution on U.S. 30

The longitudinal joint can be the most vulnerable part of roads. Air voids caused by joint construction are prone to water intrusion, and the resulting road deterioration causes issues for road construction engineers, applicators, and the driving public. Our Milestone team is working to improve this problem on U.S. 30 between State Road 55 and […]

Read More

Boost This Post

Boost Icon

Jun

24

Supporting the STEM Connection

Just a few miles from The Heritage Group headquarters on the northwest side of Indianapolis is Moore Road Farm, a property that borders Little Eagle Creek and provides habitat for a diverse collection of flora and fauna. Wandering the acres of gardens and forest trails, you’ll see all kinds of plants from squash to sunflowers to towering sycamore […]

Read More

Boost This Post

Boost Icon

Jun

21

Celebrating 30 Years of Innovation and Excellence

Thirty years ago, in June 1994, Contractors United Inc., Astro Paving and Fauber Construction merged to become Milestone Contractors LP. In the 30 years since, we have grown and added many more companies and Milestone family members, all with the mission to Make Lives Better, One Road and Bridge at a Time. As we reflect on […]

Read More

Boost This Post

Boost Icon